По-русски | Lietuviškai
Bible Way
Christian Church
Photo albums > Church building in Vilnius, Lithuania


The beginning of the construction

The building from the flying bird view 1

The building from the flying bird view 2

The building from the flying bird view 3

Building facade after the final finish

Building side after the final finish

April, 1997

April, 1997

Future canteen








The Ground Level Hall (canteen)

The Ground Level Hall (canteen)

Finished facade

Drawing-room

Kitchen (ground floor)

Lavatory

Church office
© Copyright 2000-2016, Bible Way Church, Lithuania | Webmaster | Top of page
| Home | News | Schedule of Events | About Us | Video | Our Beliefs | Pictures | Guestbook |